Montréal, Québec, - January 26, 2005 -

Dia Bras Exploration Inc. (DIB-V) (Dia Bras or the "Company") announces the latest results from their operation at the Bolivar project, northern Mexico. The mine has started to operate in late December and 1000 tons of development ore were shipped to the mill that begun its operation earlier this week.

Mine
The company started a pre-feasibility study in December 2004 in order to confirm tonnage, grade and recovery as well as assess mining/milling related costs at the former Zn-Cu-Ag-Au Bolivar Mine.

T he necessary mining equipment was bought in order to access and mine high grade ore on two different levels. Levels 1 and 6, fifty meters apart, were widened to permit mining with modern equipment of two high-grade Zn-Cu mineralized zones ranging from 2 to 15 meters wide. Already more than 300 meters of rehabilitation or new drift have been completed producing more than 1000 tons of development ore averaging 15% Zn and 3% Cu. The company plans to ship to the mill approximately 2200 tons of similar grade material in February. Starting in March, when more working faces on the Zn-Cu rich zones will be available, tonnage will improve to 3000 tons per month and grade to 25% Zn and 6% Cu with Ag and Au credit.

Mill
Dia Bras signed in November a three-year lease-purchase agreement on a 100 tpd flotation mill and invested 200 000 US$ to rehabilitate and upgrade the milling facility. The mill is located in Malpaso near Chihuahua, 125 km from the mine. Transport from the mine to the mill is by trucks and train. To transport and manipulate the ore, the company acquired a fleet of 9 dump trucks and 3 front-end loaders.

Starting in March, the Malpaso mill of Dia Bras will produce approximately 800 tons of Zn concentrates and 500 tons of Cu concentrates per month. The company is negociating presently with Mexican and international smelters interested to buy the concentrates.

Drilling
A total of 16,460 meters of drilling representing 102 holes was completed in 2004 on the Bolivar project. The holes DIA-045-04 to DIA-102-04 were drilled to test the potential high grades Zn-Cu mineralized zones easily accessible by the existing mine workings. Complete results up to hole DIA-100-04 are presented in the table below.

As part of the pre-feasibility study, an additional 20,000 meters of systematical drilling will be completed in 2005 on the Bolivar project.


HOLE


FROM:


TO:


WIDTH
(m)

Au
g/t

Ag
g/t

Cu
%

Zn
%

DIA-045-04 *

62.00

63.00

1.00

0.10

10.00

0.47

10.95

67.00

72.00

5.00

0.08

55.00

6.31

37.23

DIA-046-04 *

78.80

80.00

1.20

0.165

65.80

8.07

38.15

DIA-047-04 *

39.00

57.00

18.00

-

11.00

0.33

2.89

DIA-048-04 *

29.00

30.00

1.00

8.70

116.00

2.18

11.80

DIA-049-04

39.00

44.00

5.00

-

2.40

0.085

1.15

47.00

53.00

6.00

-

7.00

0.50

3.43

67.00

69.00

2.00

-

9.75

1.33

0.018

DIA-051-04 *

145.00

150.00

5.00

-

15.94

0.75

3.76

DIA-052-04 *

59.83

64.00

4.17

0.46

228.08

6.68

19.19

67.00

75.00

8.00

-

41.95

5.36

3.29

80.00

83.00

3.00

-

38.20

1.62

7.72

DIA-054-04 *

57.00

70.00

13.00

-

34.65

3.49

8.60

77.00

79.00

2.00

0.88

181.55

4.02

12.93

129.40

130.35

0.95

-

157.00

0.36

4.95

DIA-055-04 *

62.00

67.00

5.00

-

17.42

2.04

13.54

69.00

72.00

3.00

-

104.60

5.28

7.75

DIA-058-04 *

148.45

149.86

1.41

0.14

66.20

8.78

33.52

156.82

158.82

2.00

-

57.55

4.865

30.04

DIA-060-04 *

52.00

53.00

1.00

0.165

59.70

10.25

35.45

DIA-061-04 *

97.00

105.00

8.00

3.55

281.43

4.04

0.87

168.80

169.80

1.00

0.058

30.30

7.16

21.90

DIA-064-04 *

67.00

68.00

1.00

0.776

211.00

3.96

33.89

DIA-065-04 *

189.00

190.00

1.00

0.012

12.80

3.17

0.806

DIA-066-04 *

32.00

33.00

1.00

2.13

140.00

1.42

0.011

43.00

44.00

1.00

1.055

126.00

0.67

0.40

DIA-067-04 *

210.00

211.00

1.00

4.65

112.00

4.49

16.50

DIA-068-04

1.00

2.00

1.00

1.06

47.10

0.539

4.16

DIA-070-04

115.00

116.00

1.00

3.28

356.00

6.48

0.038

DIA-071-04 *

38.00

40.00

2.00

0.153

55.35

8.32

3.06

60.00

62.00

2.00

0.043

19.40

3.70

21.25

68.00

69.00

1.00

0.431

231.00

3.41

8.50

81.00

84.00

3.00

0.070

28.03

4.32

18.8

87.00

88.00

1.00

0.866

245.00

3.22

10.35

93.00

96.00

3.00

0.447

84.80

2.40

18.10

DIA-072-04 *

36.00

38.00

2.00

0.583

126.00

1.645

2.48

43.00

44.00

1.00

1.805

115.00

1.43

0.027

133.55

136.45

2.90

0.592

124.83

7.26

38.80

DIA-074-04

43.00

44.00

1.00

0.067

74.30

5.32

23.60

97.40

98.00

0.60

0.084

58.70

6.33

4.67

DIA-078-04 *

49.00

50.00

1.00

-

35.50

3.03

0.533

52.37

54.95

2.58

-

35.70

3.725

17.78

59.60

60.40

0.80

-

115.00

3.920

4.64

70.20

71.25

1.05

0.374

190.00

3.460

12.25

DIA-079-04

13.16

16.00

2.84

-

6.03

0.191

17.63

DIA-083-04

18.20

18.80

0.60

19.10

3.04

1.44

19.40

21.00

1.60

0.08

44.3

5.90

0.843

22.00

23.00

1.00

0.086

35.70

4.53

2.95

28.00

31.00

3.00

19.83

2.13

7.82

DIA-085-04

22.00

23.00

1.00

0.066

65.10

5.62

2.50

 

91.00

92.00

1.00

1.12

50.60

6.83

0.005

DIA-086-04

6.50

8.50

2.00

0.179

39.60

0.765

13.10

44.00

45.00

1.00

0.302

54.00

1.28

21.20

51.00

53.00

2.00

0.184

42.30

0.508

5.37

73.00

74.00

1.00

0.023

9.00

0.929

13.80

DIA-087-04 *

39.00

46.00

7.00

70.45

4.67

28.52

DIA-089-04

43.00

47.00

4.00

0.0625

79.675

1.31

10.467

DIA-090-04

49.00

53.00

4.00

0.140

43.10

1.373

15.84

DIA-091-04

31.00

33.00

2.00

0.044

34.45

2.68

4.58

34.00

36.00

2.00

0.029

20.65

2.28

7.05

39.00

43.00

4.00

0.048

45.325

4.88

12.242

48.00

52.00

4.00

0.163

104.9

3.102

10.27

DIA-095-04

38.00

39.00

1.00

0.019

3.50

0.21

8.26

49.00

50.00

1.00

0.03

44.00

1.52

5.29

53.00

54.00

1.00

0.067

99.60

9.49

1.66

 

DIA-096-04

6.00

7.00

1.00

37.80

1.97

0.957

62.00

64.00

2.00

14.35

1.095

8.315

77.00

78.00

1.00

0.122

66.70

0.064

0.066

83.00

84.00

1.00

29.00

1.04

6.03

86.00

88.00

2.00

0.142

54.95

1.415

10.565

121.00

122.00

1.00

0.83

41.00

1.00

0.008

123.00

124.00

1.00

0.494

19.40

0.96

0.016

148.00

149.00

1.00

0.706

34.80

0.84

0.012

DIA-097-04

 

47.00

49.00

2.00

42.45

1.93

2.14

52.00

53.00

1.00

72.80

1.92

13.25

60.00

61.00

1.00

0.12

25.00

3.14

2.87

62.00

63.00

1.00

0.092

54.00

3.51

8.03

DIA-098-04

140.00

142.00

2.00

0.579

92.10

1.905

7.825

216.00

217.00

1.00

0.119

39.30

4.75

34.70

217.00

218.00

1.00

21.30

1.76

9.98

DIA-100-04

35.00

36.00

1.00

5.70

8.03


About Dia Bras
Dia Bras is a Canadian mining exploration company focused on precious and base metals in the State of Chihuahua, Mexico. The Company will continue exploration and the active development of its two key projects – Bolivar and Promontorio – located in the Sierra Madre precious metal belt. The Company is traded on TSX Venture Exchange, under the symbol “DIB”.

-30-

For further information contact:

Réjean Gosselin
President

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release.